About
Infrastructure people, not general contractors.
Rakiza Links Solutions exists for the physical layer: the pathways, cabinets, cabling, hardware and low-current systems that decide whether technology environments actually stay available.
Company
Delivery discipline applied to physical work.
A specialized infrastructure company delivering the physical foundations behind reliable data centers, connected facilities and secure enterprise environments.
Our work spans data center deployment, structured cabling and passive infrastructure, ICT hardware supply and installation, ELV and security systems, and managed site services for operational environments.
Every engagement is run through a gated sequence — Discover, Define, Plan, Deploy, Test, Handover — so that scope, records and acceptance stay aligned from survey through completion.

Mission
To deliver dependable physical infrastructure and site services that improve reliability, readiness and long-term operational control.
Vision
To be a trusted infrastructure execution partner for organizations building the Kingdom's connected and mission-critical environments.
At a glance
Scale described honestly.
Figures describe the team and operating footprint, not client counts or unverified results.
- Years of team experience
- 0+
- Operating locations
- 00
- Integrated service pillars
- 00
- Delivery standard
- 00
Values
How we work on site.
- Precision
- Work is set out, measured and verified before it is called complete.
- Reliability
- Committed scope, sequence and site attendance are held to.
- Safety
- Method statements and safe practice govern every field activity.
- Accountability
- Named responsibility for scope, records and acceptance.
- Agility
- Phasing and shift work adapt to live operational constraints.
- Partnership
- Long-term technical support rather than single-transaction supply.
Delivery methodology
Six gates, each with an acceptance point.
- 01
Discover
Site conditions, existing infrastructure, access constraints and operational limits are established before any scope is priced or promised.
- Site survey
- Constraint register
- Existing-condition notes
- 02
Define
Scope, specification, materials and acceptance criteria are fixed in writing so that completion has a single agreed meaning.
- Approved scope
- Specification and BOQ
- Acceptance criteria
- 03
Plan
Sequence, resources, shift pattern, permits and safe methods are prepared and aligned with the site's operational calendar.
- Delivery programme
- Method statements
- Permit and access plan
- 04
Deploy
Installation is executed to the approved drawings with supervised field discipline, tidy containment and progressive labeling.
- Installed infrastructure
- Progress records
- Labeling applied
- 05
Test
Copper certification, optical loss and OTDR results, end-face inspection and functional checks are captured and reviewed against the criteria.
- Test packs
- Inspection results
- Snag list and closure
- 06
Handover
As-built data, asset records and test documentation are issued together with formal acceptance of the delivered scope.
- As-built drawings
- Asset and port records
- Documented acceptance
No transition without the required information, approved outputs and documented acceptance.
Locations
Two operating locations.
Riyadh
Saudi Arabia
4055 Prince Mamduh Bin Abdulaziz StAs SulimaniyahRiyadh 12445Saudi ArabiaDelivery and field operations for the Kingdom
Manchester
United Kingdom
Unit 7 Initial Business CenterWilson Business ParkManchesterUnited Kingdom, M40 8WNSupply coordination and technical support

Saudi Vision 2030
Physical foundations for a digital economy.
Cloud, smart services, AI and data-intensive operations rely on secure facilities, resilient pathways and well-documented physical infrastructure.
- Resilient Facilities
- Physical environments built to hold up under continuous operation.
- Connected Systems
- Passive pathways and cabling that carry growing data demand.
- Local Technical Support
- Field capability available where the sites actually are.
- Operational Readiness
- Tested, labeled and documented infrastructure at handover.
Why Rakiza
A practical partner for physical delivery.
Defined scope. Disciplined fieldwork. Documented results.
- Specialized Focus
- Physical infrastructure is the core business, not a side activity beside software or resale.
- 10+ Years of Team Experience
- Field and supervisory experience across data centers, enterprise sites and low-current systems.
- Controlled Delivery
- Gated stages, approved scope and documented acceptance at each transition.
- Two Operating Locations
- Riyadh delivery presence supported by Manchester coordination.
- Vendor-Aware Execution
- Installation practice follows the approved specification and the manufacturer's requirements.
- Clear Handover
- Test packs, labeling records and as-built data issued as part of completion.

Next step
Talk to the team that will actually be on site.
Share the site, the scope and the constraints. We will respond with what can be delivered, in what sequence, and what will be documented at handover.