About

Infrastructure people, not general contractors.

Rakiza Links Solutions exists for the physical layer: the pathways, cabinets, cabling, hardware and low-current systems that decide whether technology environments actually stay available.

Company

Delivery discipline applied to physical work.

A specialized infrastructure company delivering the physical foundations behind reliable data centers, connected facilities and secure enterprise environments.

Our work spans data center deployment, structured cabling and passive infrastructure, ICT hardware supply and installation, ELV and security systems, and managed site services for operational environments.

Every engagement is run through a gated sequence — Discover, Define, Plan, Deploy, Test, Handover — so that scope, records and acceptance stay aligned from survey through completion.

Two site engineers reviewing installation drawings inside a technical room

Mission

To deliver dependable physical infrastructure and site services that improve reliability, readiness and long-term operational control.

Vision

To be a trusted infrastructure execution partner for organizations building the Kingdom's connected and mission-critical environments.

At a glance

Scale described honestly.

Figures describe the team and operating footprint, not client counts or unverified results.

Years of team experience
0+
Operating locations
00
Integrated service pillars
00
Delivery standard
00

Values

How we work on site.

Precision
Work is set out, measured and verified before it is called complete.
Reliability
Committed scope, sequence and site attendance are held to.
Safety
Method statements and safe practice govern every field activity.
Accountability
Named responsibility for scope, records and acceptance.
Agility
Phasing and shift work adapt to live operational constraints.
Partnership
Long-term technical support rather than single-transaction supply.

Delivery methodology

Six gates, each with an acceptance point.

  1. 01

    Discover

    Site conditions, existing infrastructure, access constraints and operational limits are established before any scope is priced or promised.

    • Site survey
    • Constraint register
    • Existing-condition notes
  2. 02

    Define

    Scope, specification, materials and acceptance criteria are fixed in writing so that completion has a single agreed meaning.

    • Approved scope
    • Specification and BOQ
    • Acceptance criteria
  3. 03

    Plan

    Sequence, resources, shift pattern, permits and safe methods are prepared and aligned with the site's operational calendar.

    • Delivery programme
    • Method statements
    • Permit and access plan
  4. 04

    Deploy

    Installation is executed to the approved drawings with supervised field discipline, tidy containment and progressive labeling.

    • Installed infrastructure
    • Progress records
    • Labeling applied
  5. 05

    Test

    Copper certification, optical loss and OTDR results, end-face inspection and functional checks are captured and reviewed against the criteria.

    • Test packs
    • Inspection results
    • Snag list and closure
  6. 06

    Handover

    As-built data, asset records and test documentation are issued together with formal acceptance of the delivered scope.

    • As-built drawings
    • Asset and port records
    • Documented acceptance

No transition without the required information, approved outputs and documented acceptance.

Locations

Two operating locations.

Riyadh

Saudi Arabia

4055 Prince Mamduh Bin Abdulaziz StAs SulimaniyahRiyadh 12445Saudi Arabia

Delivery and field operations for the Kingdom

Manchester

United Kingdom

Unit 7 Initial Business CenterWilson Business ParkManchesterUnited Kingdom, M40 8WN

Supply coordination and technical support

Riyadh skyline with modern financial district towers

Saudi Vision 2030

Physical foundations for a digital economy.

Cloud, smart services, AI and data-intensive operations rely on secure facilities, resilient pathways and well-documented physical infrastructure.

Resilient Facilities
Physical environments built to hold up under continuous operation.
Connected Systems
Passive pathways and cabling that carry growing data demand.
Local Technical Support
Field capability available where the sites actually are.
Operational Readiness
Tested, labeled and documented infrastructure at handover.

Why Rakiza

A practical partner for physical delivery.

Defined scope. Disciplined fieldwork. Documented results.

01
Specialized Focus
Physical infrastructure is the core business, not a side activity beside software or resale.
02
10+ Years of Team Experience
Field and supervisory experience across data centers, enterprise sites and low-current systems.
03
Controlled Delivery
Gated stages, approved scope and documented acceptance at each transition.
04
Two Operating Locations
Riyadh delivery presence supported by Manchester coordination.
05
Vendor-Aware Execution
Installation practice follows the approved specification and the manufacturer's requirements.
06
Clear Handover
Test packs, labeling records and as-built data issued as part of completion.
Data center facility exterior at dusk with rooftop cooling plant

Next step

Talk to the team that will actually be on site.

Share the site, the scope and the constraints. We will respond with what can be delivered, in what sequence, and what will be documented at handover.