Empty data center white space with raised floor and overhead containment during fit-out

Service 01

Data Center Deployment

From prepared space to tested, labeled and operationally ready physical infrastructure.

Overview

White space to operational readiness

A data hall becomes usable only when its physical layer is complete: cabinets set out and secured, containment routed, power and data pathways separated, cabling terminated and certified, and every port identified.

Rakiza Links Solutions delivers that work as a controlled sequence, so the room is handed over with records that match what was actually installed.

Capabilities

  • White Space Fit-Out
  • Rack & Stack
  • Migration & Relocation
  • Testing & Handover

Scope of work

What is actually delivered.

01

White space fit-out

Cabinet and aisle set-out, floor and plinth coordination, containment installation, grounding and bonding, and preparation of the room for equipment intake.

02

Rack & stack

Cabinet build, rail and shelf fitting, equipment mounting, power cord dressing, structured patching and progressive labeling as work proceeds.

03

Migration & relocation

Asset capture, phase planning, de-rack and re-rack under agreed windows, transport handling and post-move physical verification.

04

Testing & handover

Copper certification, optical loss and OTDR results, end-face inspection, port verification, snag closure and issue of the completed test pack.

Our approach

How the work is controlled.

Open server cabinet being populated during a data center rack and stack installation
  1. 01

    Survey before commitment

    Access routes, floor loading, containment capacity and existing infrastructure are recorded before scope is fixed.

  2. 02

    Set out, then build

    Layout is marked and agreed on site so cabinet positions, aisle widths and pathway routes are correct before installation volume begins.

  3. 03

    Label as you go

    Identification is applied during installation rather than reconstructed afterwards, which keeps records and reality aligned.

  4. 04

    Stage acceptance

    Rooms, rows or phases are accepted individually so the client can begin using completed areas.

Verification & handover

What you receive at acceptance.

Handover is a package, not a phone call: test data, labeling records and as-built information that reflect the installed condition.

  • Discover
  • Define
  • Plan
  • Deploy
  • Test
  • Handover
  • Fluke copper channel or permanent link certification
  • Optical loss testing and OTDR traces on fiber links
  • Fiber end-face inspection and cleaning records
  • Label and port verification against the port schedule
  • Rack elevation as-builts and asset records
  • Snag list with documented closure

Typical sectors

  • Cloud & Digital
  • Government
  • Telecom
  • Finance
Data center facility exterior at dusk with rooftop cooling plant

Next step

Let's build the infrastructure your growth depends on.

Share the site, the scope and the constraints. We will respond with what can be delivered, in what sequence, and what will be documented at handover.