Overview
White space to operational readiness
A data hall becomes usable only when its physical layer is complete: cabinets set out and secured, containment routed, power and data pathways separated, cabling terminated and certified, and every port identified.
Rakiza Links Solutions delivers that work as a controlled sequence, so the room is handed over with records that match what was actually installed.
Capabilities
- White Space Fit-Out
- Rack & Stack
- Migration & Relocation
- Testing & Handover
Scope of work
What is actually delivered.
White space fit-out
Cabinet and aisle set-out, floor and plinth coordination, containment installation, grounding and bonding, and preparation of the room for equipment intake.
Rack & stack
Cabinet build, rail and shelf fitting, equipment mounting, power cord dressing, structured patching and progressive labeling as work proceeds.
Migration & relocation
Asset capture, phase planning, de-rack and re-rack under agreed windows, transport handling and post-move physical verification.
Testing & handover
Copper certification, optical loss and OTDR results, end-face inspection, port verification, snag closure and issue of the completed test pack.
Our approach
How the work is controlled.

- 01
Survey before commitment
Access routes, floor loading, containment capacity and existing infrastructure are recorded before scope is fixed.
- 02
Set out, then build
Layout is marked and agreed on site so cabinet positions, aisle widths and pathway routes are correct before installation volume begins.
- 03
Label as you go
Identification is applied during installation rather than reconstructed afterwards, which keeps records and reality aligned.
- 04
Stage acceptance
Rooms, rows or phases are accepted individually so the client can begin using completed areas.
Verification & handover
What you receive at acceptance.
Handover is a package, not a phone call: test data, labeling records and as-built information that reflect the installed condition.
- Discover
- Define
- Plan
- Deploy
- Test
- Handover
- Fluke copper channel or permanent link certification
- Optical loss testing and OTDR traces on fiber links
- Fiber end-face inspection and cleaning records
- Label and port verification against the port schedule
- Rack elevation as-builts and asset records
- Snag list with documented closure
Typical sectors
- Cloud & Digital
- Government
- Telecom
- Finance

Next step
Let's build the infrastructure your growth depends on.
Share the site, the scope and the constraints. We will respond with what can be delivered, in what sequence, and what will be documented at handover.